Conclusion:
Based on the information gathered from the charts and graphs obtained through Climate Consultant, one can assume several items: the relative humidity in Boston is somewhat low, wind velocity remain somewhat consistant in the 10-15 mph range, as well as the summer air providing a moderately dry wind. Based on this knowledge, one can assume that passive cooling methods maybe a possibility for cooling spaces (i.e. cross ventilation rather then depending on a mechanical system). Determining a heating system must be assumed as a priority over cooling. Determining an energy efficient system and cost effective solutions will probably require multiple elements/building componenets and disciplines (arch. and engineering) to acheive satisfactory thermal comfort and cost effective results for clients (i.e. double skinned facades, geo-thermal pumps, building orientation).
No comments:
Post a Comment